· Schedule 40 electrical pipe (not water pipe).
· Diameter:
o Under 300 feet: minimum of 1.5″ diameter.
o Over 300 feet: 2″ diameter.
· Use long sweeps (not 90-degree elbows or “L” shaped angles)
Unlike copper, fiber will break if bent at sharp angles.
· Follow the route of other underground utilities.
· Must extend the full distance from utility pole to building exterior or backboard.
· Must emerge flush with the utility pole and building’s exterior or backboard.
· Must attach to the building or backboard, and the utility pole with conduit straps (u-clamps).
· Attach in the same area on the building’s exterior or backboard as other utilities’ boxes.
· Trenched 24″ deep, unless it passes under a road/driveway where it must be buried 36″ deep.
· Extend 18” – 24” above grade both on the exterior of the building or backboard, and 18” – 24” above grade on the same side of the pole as other utility lines (do not wrap it around or attach to a different side of the pole).
· Conduit over 500’ requires intermediate pull boxes or pedestals every 500’
· Install 14-16 gauge coated tracer wire on top of the conduit for Dig Safe and future location, as ECFiber does not use “toneable” cable.
· Use 210-250lb tensile-strength pull string.
· Extend pull string 2 feet beyond each end of the conduit. Tie the pull string around the outside of the conduit and place an unglued cap over the ends of the conduit to prevent water from entering.
· No weather heads. Install temporary (unglued) caps or plastic bags on ends to keep water out prior to installation. After fiber is installed, we will use a specialized putty to plug the conduit.
· Flush with structure or pole
· Well-secured to the pole and to house or backboard with conduit straps (u-clamps)
· Capped with temporary caps to keep water out (not glued!)